Construction is in full swing
Gallery from the club archive, photos by Dawid Zajączkowski.
Gallery from the Wisła Kraków archive — construction photos.
The building is slowly taking shape. The ground floor walls of the "rotunda" are already being erected. The fan room is under construction, and soon sanitary facilities, a buffet, and technical rooms will be built.
Photos taken on September 27, 2007, photo by Dawid Zajączkowski, 12 photos.
Material transferred from the club archive (archiwum.wisla.krakow.pl).